Application method of small liquid filling machine

by admin

1. The ground wire must be well grounded before the machine works, and then the appropriate standard syringe shall be selected according to different sub packaging quantities. Generally, 1ml syringe is used when the sub packaging range is 0.2-1ml; Use 5ml syringe when 1-5ml; Use a 10ml syringe when it is 5-10ml; 20ml model, using 20ml glass enema; 100ml model, use 100ml glass enema (also use the special stainless steel filling system produced by our factory); 500ml model uses the special stainless steel filling system produced by our factory
2. Pull out the inner core of the syringe, put the screw sleeve on the inner core of the syringe (Note: for 10ml model, due to the large difference in syringe diameter, the gasket needs to be selected according to its outer circle size) and fasten it with the screw sleeve properly with the lower base (pay attention to cleaning when disassembling the syringe)
3. Put the upper clamp seat on the water outlet end of the syringe jacket, and properly tighten the nuts on both sides (when using 5ml syringe, put the bushing together and tighten it. Pay attention to that if it is tightened too tightly, the jacket tube is fragile). Note: 10ml models have adjusting sleeves, while 20, 100 and 500 models do not
4. Assemble the inner core and outer sleeve of the installed syringe into one, and the liquid injection system is assembled
5. Fix the valve with the arrow upward and the arrow mark outward on the fixing screw with a nut
6. Assemble the complete liquid injection system, align the upper and lower circular holes of the liquid injection system components with the upper and lower fixing rods respectively, and put them on the bearing, and make the outer end face flush with the bearing surface. When assembling the lower end, do not make the screw sleeve collide with the crank to prevent abnormal sound when the upper crank rotates (the distance between the screw sleeve and the crank is about 1mm during correct installation). After the liquid injection system is correctly installed, tighten the upper and lower set screws. Connect the syringe with the valve connecting nozzle with a short rubber hose. The liquid inlet pipe is connected with the water inlet, and the liquid outlet pipe is connected with the water outlet. In order to prevent the liquid inlet and outlet pipe from winding, clamp the liquid inlet and outlet pipe into the side support lug of the casing
7. The crank should be able to rotate freely by hand, otherwise the assembly is wrong. Check whether the liquid injection system is fastened on the rotating bearing
8. For 100ml models, if the special stainless steel filling system produced by our factory is used, please refer to 500ml models for installation methods